Live edge slabs

All of the slabs below are in the process of air drying. Most slabs require 3-6 months of air drying before they are ready for the kiln. Typically, slabs take 12 weeks in the kiln after air drying properly. Please click the link and fill out the form to receive a free quote.

Shop

Slab Species

Slab Width

Slab Length

Showing all 9 results